BELL 212
COMPLETE REWIRE / WEIGHT LOSS PROGRAM – COMPLETED DECEMBER 2018
- BHT MAIN AIRFRAME COMPLETE REWIRE (EXCLUDING HEAVY GUAGE)
- BHT ACCESORY HARNESSES REPAIR AND REPLACEMENT
- VFR UTILITY PACKAGE DESIGN AND INSTALL
- VFR AVIONICS PACKAGE DESIGN AND INSTALL
- GOODRICH HOIST INSTALL
- LIGHTED PANELS DESIGN AND OVERHAUL
- IAS CUSTOM DESIGN PERFORMANCE FEATURES
Completed in the winter of 2018 on time and on budget. Part one of a two consecutive machine fleet standardization. IAS and AAL worked with the customer to provide a well equipped yet efficient design. The installation of customer desired systems integrated seamlessly with our innovative 3-Dimensional standard 212 airframe rewire harness. IAS rewire harnesses are completed 70 % off aircraft reducing downtime.